In order to be able to access the new mudroom, an exterior door had to be added, the window was moved and replaced so it was centered, a closet was framed in where the stand up shower used to be...

The original heart pine flooring (that had been pulled up from the area of the new bathroom) was hung on the ceiling...and a new light wired and hung...

This is area where the current Master bath was built. The flooring was pulled up so that plumbing could be run and tile laid. We used this flooring for the mudroom ceiling.

This is the night we found out that SUBFLOORNG was not part of the building process in the 1930s!! There is nothing quite like being able to look under your house...and for all that is under your house to have easy access in:(

Tile was laid--of course in a more complicated chevron pattern because Steve would be shocked if I wanted anything simple :D